Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.
													
																	Mineral roll roofing installation. 
									
	
		
	
																	Place 9 wide strips of roll roofing along the eaves and rakes positioning them to overhang the deck to 3 8. 
																	Plan so that no two butt joints are closer than 2 feet from each other. 
																	To seal a plumbing vent spread roofing. 
																	Place a 9 229 mm wide starter strip along eave and rake edges so it overhangs the drip edge 1 4 6 3 mm. 
															
													
									
	
		
	
																	Things you ll need rolled roofing razor knife trowel brush hose measuring tape ladder roofing cement 1 inch 2 5 cm long roofing nails hammer chalk. 
																	How to do it attach first course.